The method that the job sheds a product to offer a kind of graph to change will describe and realize working inpour Cheng. The icon that every measure of the process changes with a graph will express. Pass the join of these pair of icon, the architect can describe the relation between measure and way by. To every measure character, the interface that the architect can appoint this measure user to participate in a process and the electronic form that the job that needs to finish wants.
The automation process that next we report with monthly business is exemple. The report includes accumulative total to realize gain by, profit anticipates, and the plan that new order registers is revised, the form that the element such as the profit before duty makes and a chart that contrast these element and annual plan are comprised, process must comply with is as follows regular:
Monthly updates the report;
Present order form logs onto an administrator to be in charge of filling in by order;
Undertake forecasting on the foundation that next monthly order are in charge of selling a state in the home with product A and respective B by product manager, by exit the selling manager forecasts the sale of all product international market;
Profit is forecasted by production the manager is on the foundation that be produced in Cheng currently and predicts order finish;
Current the accrual before the accrual before duty and duty is forecasted by basis of the person that control current accrual and accrual are forecasted fill in;
Current accrual and accrual are forecasted in saving the patulous form in an Excel, this form also is used at creating tabular report and graph.
This process included following measure:
Measure 1: Periodic initialization. This measure starts a process automatically in.
Measure 2: Read the data that takes a cycle. This measure is one is used at reading to take periodic and actual profit and the Flobot that expect earnings by " training " actually (the job sheds a robot) .
Previous12 Next
